Changchun Gaoxiang Special Pipes co.,ltd
Tel:0086(0)431-89652399
Fax: 0086(0)431-85551155
Code: 130012
Email: golsunpipe@golsunpipe.com
golsun_pipe@golsunpipe.com
Add:NO.781 Xuehai Street Gaoxin District, Changchun, Jilin Province, China
End fitting is an important component of the pipe system. The function of the end fitting is to terminate all of the pipe layers and transfer all the loads from the pipe to the support structure. The end fitting will be machined from wrought steel. The material can be either carbon steel or stainless steel depending on the functional requirement of the project.
Metal joints and other connections between the way there are welding, quick connection, flange connection, elbow three way connection, etc..
Continuous reinforced plastic composite pipe in the use of the process, due to the external force or other causes damage, only will undermine the truncation, re install withhold metal connector and connection can be used, the maintenance time for 1 to 3 hours.
When the Solidification jam is in the pipeline, the heating equipment can be heated by the customized heating equipment. The general power can be done for 2 to 6 hours to complete the work.